OMYA MINERAL PHILIPPINES INC, Philippines

Project Name

Ball Mill Girth Gear and Pinion Gear Tooth Inspection

Scope of Works:

  • Pre‐inspection of Equipment conditions
  • Removal/Re-installation of Girth Gear Half casing guards
  • Removal/Re-installation of Pinion Gear Half casing
  • Cleaning of Girth gear and Pinion Gear tooth
  • Application Dye Penetrant Test (DPT) in all Gear tooth
  • Visual Inspection and analyzation of Gear Tooth
  • Inspection of Gear Lubrication Spray System

Project Date

December 16 – 18, 2021

Category

Shutdown Works

Project Name

Replacement of Impact Crusher Apron and Drive Bearings

Scope of Works:

  • Pre‐inspection of Equipment conditions
  • Removal/Re-installation of Pulley
  • Inspection and cleaning of drive shafting
  • Replacement of DE/NDE bearings
  • Replacement of Apron w/ liner A & B
  • Inspection and replacement of V‐belts
  • Alignment and tensioning of Drive Pulleys and belts
  • Setting of clearances from rotor to apron A & B
  • Setting of clearances of pressure spring

Project Date

December 16 – 18, 2021

Category

Shutdown Works

PETRON CORPORATION, Philippines

Project Name

Preventive Maintenance of Thermal Fluid Heater

Scope of Works:

  • Pre‐inspection of Equipment conditions
  • Removal/Re-installation of instrumentation, claddings and electrical wirings
  • Erection of scaffoldings, frames and removal of corrugated sidings
  • Inspection and cleaning of burner rod
  • Removal/Re-installation of top cover and coil assembly
  • Cleaning and inspection of coil assembly and inner chamber shell
  • DPT check of coil assembly, inner chamber shell and nozzle weldments
  • Pneumatic test and conduct air leak test using bubble spray
  • Cleaning and Inspection of strainers and piping
  • Fuel gear pump inspection and cleaning of strainers
  • Air blower inspection and cleaning of impeller
  • Insulation resistance check of gear pump, blowers and process pump
    motor
  • Inspection of limit switches, interlocks, sensors, thermocouple and
    pressure gauge
  • Verification of all instrumentation devices

Project Date

March 31 – April 03, 2021

Category

Shutdown Works

FCF MINERALS CORPORATION, Philippines

Project Name

SAG MILL Driveline Alignment 2021

Scope of Works:

  • Initial Alignment of low speed coupling
  • Initial Alignment of High speed coupling
  • Adjustment and alignment of gearbox to motor shaft

Project Date

November 05 – 06, 2020

Category

Shutdown Works

FCF MINERALS CORPORATION, Philippines

Project Name

SAG MILL Driveline Alignment Check 2020

Scope of Works:

  • High Speed and Low Speed Coupling Alignment Check
  • Flank Alignment Check for Girth Gear and Pinion Gear
  • Root Clearance Check of Girth Gear and Pinion Gear
  • Tooth Contact Check of Girth Gear and Pinion Gear
  • Lubrication Spray System Check

Project Date

November 05 – 06, 2020

Category

Shutdown Works

TAGANITO HPAL NICKEL CORPORATION, Philippines

Project Name

Charging of Ball Mill Steel Balls

Project Date

March, 2018

Category

Shutdown Works

Project Name

Belt Conveyor Idler Replacement

Project Date

March 2018

Category

Shutdown Works

Project Name

Drum Washer Support Roller Bearing Replacement

Project Date

September 2018

Category

Shutdown Works

Project Name

Vibrating Screen Gearbox Bearing Replacement

Project Date

September 2018

Category

Shutdown Works

NIHON YAKIN, Japan

Project Name

Ball Mill Replacement of Flywheel Drive Bearing

Project Date

September 2018

Category

Shutdown Works